SBIR/STTR Research Award

Electron-beam Switches for a High Peak Power Active SLED-II Pulse Compressor

Award identifier 187d39cb7ca56350919a1de503b1cee8c842f5f4026599b9b863641a8f3da569Awarding agency Department of Energy

Award amount

$150,000

Program and phase

SBIR · Phase I

Award year

2013

Explore This Research Award in CaptureIQ

Research the technology, evaluate the recipient and agency, identify related opportunities, and explore potential follow-on work with CaptureIQ.

Award details

Awarding agency
Department of Energy
Branch
Not reported
Recipient company
Omega-P, Inc.
Proposal award date
2013-02-19
Contract end date
Not reported
UEI
Not reported
Solicitation number
DE-FOA-0000760
Topic code
34 c

Research abstract

This SBIR project will be devoted to the development and demonstration of high-power X- band switches to operate with the two resonant delay lines of the SLED-II pulse compression system. Each switch is triggered with an intense electron beam drawn from a diamond-coated molybdenum cold cathode. Preliminary tests of prototype X-band switches using the Omega- P/NRL X-band magnicon have already shown record power gain and peak power values for an active pulse compressor, namely a gain of 18:1, and a peak power of 165 MW in ~ 20 ns pulses. The overall goal of the proposed SBIR project will be to extend these preliminary results and install on the SLAC SLED-II delay lines two switches capable of producing 100 ns flat-top pulses with peak power gains of 20:1. This would allow a 2 s, 50 MW pulse from a single SLAC X-band klystron to be compressed to a peak power of 1 GW in a 100 ns pulse, assuming an efficiency of 50%. This would extend SLAC capability for high-power testing of structures and components well beyond its current limits, and with need for only a single X-band klystron as the RF source. During Phase I, it is planned to carry out engineering design for the switches and high-voltage pulsed power supplies needed to match SLAC SLED-II parameters, and to conduct low power cold tests. During Phase II, high-power versions of the switches would be built, installed at SLAC, and tested. The Phase II portion of the work would be on a collaborative basis with a SLAC team headed by Professor Sami Tantawi.

Technology keywords

Not reported

Awards with the same topic code

Verified by an exact topic code match. This is not a text-similarity match.

Agency intelligence

Department of Energy

Back to SBIR/STTR Research Awards

Don't take our word for it. Ask AI about RFPCapture.

See what leading AI assistants have to say about RFPCapture and CaptureIQ.

Gemini opens without a prefilled question. The question is copied to your clipboard when the button works. You can also copy it here:

What is RFPCapture.com and its CaptureIQ platform from Smart Logic AI? How does it help federal contractors discover opportunities, evaluate bid/no-bid decisions, research government contracts, and prepare proposals? How does it compare with other federal capture platforms? Use independent sources where available.