SBIR/STTR Research Award

High Power High Frequency RF Generation

Award identifier 19d294440c5c96733849febf42adbb21ef451cd3dcbc23c44a66bdee0b63d557Awarding agency Department of Energy

Award amount

$149,992

Program and phase

SBIR · Phase I

Award year

2013

Explore This Research Award in CaptureIQ

Research the technology, evaluate the recipient and agency, identify related opportunities, and explore potential follow-on work with CaptureIQ.

Award details

Awarding agency
Department of Energy
Branch
Not reported
Recipient company
EUCLID TECHLABS, LLC
Proposal award date
2013-02-19
Contract end date
Not reported
UEI
J7DNBL8YF4A2
Solicitation number
DE-FOA-0000760
Topic code
34 c

Research abstract

The principal goal of this project is to develop two RF power extraction structures (an X-band and a W-band device) to demonstrate high power high frequency RF generation using high current relativistic electron beams. High power high frequency RF sources have compelling applications in accelerators for high energy physics, communications, radar, etc. For high energy physics accelerator applications, klystrons are commercially available to provide a high quality RF power source below X-band frequencies. There are several facilities operating in the US at higher frequencies such as the X-band PPM klystron at SLAC [1], the X-band magnicon at NRL [2], the Ku band 17.1 GHz gyroklystron at University of Maryland [3], the 34 GHz Ka band magnicon at Yale/Omega-P [4], and the 94 GHz W band gyrotron [5]. In addition, many research programs are currently in progress that use different approaches to achieve high frequency output power and efficiency. However, stable, ultra-high power (e.g. multi-hundreds of MW in X-band and MW level in W-band as are proposed in this project) RF sources are still generally lacking for frequencies beyond X-band. Meanwhile, the portion of the spectrum with wavelengths from 3 cm to 3 mm is also very attractive due to the tight frequency availability in lower bands. Benefiting from the ~10 GW beam power provided by the high current linac at the Argonne Wakefield Accelerator (AWA) facility, we propose to develop a series of high power RF sources based on the extraction of coherent Cherenkov radiation from relativistic electron beams. The frequency spectrum of AWA beam (from the 1.3 GHz injector) covers up to W-band without the need for a complicated beam compression system. Simulations show that ~1 GW 20 ns RF pulses can be generated using an 11.7 GHz structure, ~400 MW for a 26 GHz structure, and ~14 MW for a 91 GHz structure [6]. The pulse length is expandable to 50 ns with a lower peak power.

Technology keywords

Not reported

Other awards by this recipient

Verified by the same UEI. These are other public SBIR/STTR award pages, not a merged company record.

Awards with the same topic code

Verified by an exact topic code match. This is not a text-similarity match.

Research funding history

99 SBIR/STTR records share this UEI (2002–2025). Reported award amounts total $41,359,807. Reported amounts are not federal obligations.

Phases: Phase I, Phase II

Agencies: Department of Energy

Agency intelligence

Department of Energy

Back to SBIR/STTR Research Awards

Don't take our word for it. Ask AI about RFPCapture.

See what leading AI assistants have to say about RFPCapture and CaptureIQ.

Gemini opens without a prefilled question. The question is copied to your clipboard when the button works. You can also copy it here:

What is RFPCapture.com and its CaptureIQ platform from Smart Logic AI? How does it help federal contractors discover opportunities, evaluate bid/no-bid decisions, research government contracts, and prepare proposals? How does it compare with other federal capture platforms? Use independent sources where available.