SBIR/STTR Research Award

50 MW S-Band PPM Klystron

Award identifier 37ccc87607b7c320b3f31c55b688d121e2873f4055a7b267877cb977fc930914Awarding agency Department of Energy

Award amount

$132,544

Program and phase

SBIR · Phase I

Award year

2013

Explore This Research Award in CaptureIQ

Research the technology, evaluate the recipient and agency, identify related opportunities, and explore potential follow-on work with CaptureIQ.

Award details

Awarding agency
Department of Energy
Branch
Not reported
Recipient company
CALABAZAS CREEK RESEARCH, INC.
Proposal award date
2013-02-19
Contract end date
Not reported
UEI
M3LBSJNCR1Z5
Solicitation number
DE-FOA-0000760
Topic code
34 c

Research abstract

This proposal addresses the need for a high efficient 50 MW S-Band pulsed klystron with Permanent Magnet Focusing (PPM) for the X-FEL linac proposed by Los Alamo National Laboratory, This klystron will have a minimum pulse width of 4 microseconds at a pulse repetition frequency of 50 Hz resulting in an average RF output power of 10 kW. We will employ a passive PPM focusing arrangement in place of a large water cooled electromagnet and a DC power supply. This arrangement increases the overall efficiency and reduces the size of the klystron. Calabazas Creek Research Inc., based on technology developed through a Phase I grant for a 500 kW PPM L-Band klystron and an ongoing Phase II grant for a 10 kW CW PPM S-band klystron, proposes to develop this 50 MW PPM klystron employing the in-house klystron large signal code KLSC and the leased large signal code TESLA for simulation of the interaction circuit. These two codes have been authenticated with experimental results. We will also employ our unique PPM structure, which relies on 4 disc shaped permanent magnets in lieu of the conventional half round magnets. This arrangement provides complete access to the cavities for cooling and tuning. The electron gun will be a simple cathode-anode diode and will be cathode pulsed. Complete simulation of both the interaction circuit and electron gun will be accomplished in Phase I.

Technology keywords

Not reported

Other awards by this recipient

Verified by the same UEI. These are other public SBIR/STTR award pages, not a merged company record.

Awards with the same topic code

Verified by an exact topic code match. This is not a text-similarity match.

Research funding history

138 SBIR/STTR records share this UEI (1995–2024). Reported award amounts total $43,761,170. Reported amounts are not federal obligations.

Phases: Phase I, Phase II

Agencies: Department of Energy, Department of Defense, National Aeronautics and Space Administration, National Science Foundation

Agency intelligence

Department of Energy

Back to SBIR/STTR Research Awards

Don't take our word for it. Ask AI about RFPCapture.

See what leading AI assistants have to say about RFPCapture and CaptureIQ.

Gemini opens without a prefilled question. The question is copied to your clipboard when the button works. You can also copy it here:

What is RFPCapture.com and its CaptureIQ platform from Smart Logic AI? How does it help federal contractors discover opportunities, evaluate bid/no-bid decisions, research government contracts, and prepare proposals? How does it compare with other federal capture platforms? Use independent sources where available.