Fast Pyrolytic Solid Waste Remediation for Small Contingency Base Camps
Award amount
$149,920Program and phase
SBIR · Phase IAward year
2012Award details
- Awarding agency
- Department of Defense
- Branch
- Army
- Recipient company
- MAINSTREAM ENGINEERING CORP
- Proposal award date
- 2012-05-29
- Contract end date
- Not reported
- UEI
- YR8FJBGXWRR1
- Solicitation number
- 2012.1
- Topic code
- OSD12-EP2
Research abstract
Technology keywords
Not reported
Other awards by this recipient
Verified by the same UEI. These are other public SBIR/STTR award pages, not a merged company record.
- Magnetic Bearings for Cryogenic Fluid Management
- Rapid ASCENT Propellant Loading Operations
- On-Demand Repair Part Manufacturing with MRAM
- Extremely Uniform, High Quality, and Isotopically Pure SiC Epiwafers for Quantum
- Compact, Deployable Water Purification System
Awards with the same topic code
Verified by an exact topic code match. This is not a text-similarity match.
- Fast Pyrolytic Solid Waste Remediation for Small Contingency Base Camps
- Fast Pyrolytic Solid Waste Remediation for Small Contingency Base Camps
- Solid Waste Remediation System (SWRS) for Small Contingency Base Camps
- Solid Waste Destruction System (SWDS) for Small Contingency Base Camps
- Solid Waste Remediation System (SWRS) for Small Contingency Base Camps
Research funding history
518 SBIR/STTR records share this UEI (1987–2025). Reported award amounts total $184,860,329. Reported amounts are not federal obligations.
Phases: Phase I, Phase II, Phase II – Direct to Phase II
Agencies: Department of Defense, Department of Energy, National Aeronautics and Space Administration, Department of Transportation, Department of Health and Human Services, Environmental Protection Agency