SBIR/STTR Research Award

Spiral Welded Wind Turbine Towers

Award identifier 1b5f1fe565bd0e4e696e359fb82c8d404a77927dedc709da91a7a87c36a035a9Awarding agency Department of Energy

Award amount

$150,000

Program and phase

SBIR · Phase I

Award year

2011

Explore This Research Award in CaptureIQ

Research the technology, evaluate the recipient and agency, identify related opportunities, and explore potential follow-on work with CaptureIQ.

Award details

Awarding agency
Department of Energy
Branch
Not reported
Recipient company
Keystone Tower Systems, Inc.
Proposal award date
2011-06-17
Contract end date
2012-05-16
UEI
WRAXNM7HPE37
Solicitation number
DE-FOA-0000413
Topic code
07 a

Research abstract

Large-scale wind turbine designs are significantly constrained by transportation limits. As utility scale wind turbines have developed, they have steadily increased in size and have seen a steady decrease in cost of energy. However, further increases in on-shore turbine size beyond 3MW are prohibited by hard limits in the size of components that can be economically transported to the wind farm site. The wind turbine tower is one of the components that are constrained by transportation limits. Steel monopole towers for wind turbines have been found to be technically and economically superior to competing designs (i.e., fully concrete or steel/concrete hybrids) but cannot be transported on-road for turbines larger than 3MW. In addition, steel monopoles in the 1.5-3MW range are non-optimally designed due to transportation constraints, and must use significantly more steel than optimal in order to stay within a 4.3m diameter transportation limit. Conispire has developed a technique to eliminate this transport barrier and enable use of large diameter, weight-optimized towers through on-site production. We have identified and proven (using a small-scale prototype) a geometrical construction that enables on-site construction of tapered steel monopoles using spiral welding. Spiral welding is a proven technology widely used for on-site manufacture of large diameter steel tubes for the pipeline industry. On-site production allows large diameter towers to be constructed, achieving weight reductions of 40% or more for turbines in the 2-3MW range, and enabling low cost steel monopoles to be used for turbines over 3MW. Transportation costs are also significantly reduced as materials can be shipped as hot rolled coil stock using standard flat bed trucks rather than the expensive specialty shipping methods currently required. These savings add up to a roughly 5% reduction in cost of energy with existing turbines and hub-heights, and significantly more as designs shift to larger turbines and higher hub heights

Technology keywords

Not reported

Other awards by this recipient

Verified by the same UEI. These are other public SBIR/STTR award pages, not a merged company record.

Awards with the same topic code

Verified by an exact topic code match. This is not a text-similarity match.

Research funding history

7 SBIR/STTR records share this UEI (2011–2016). Reported award amounts total $3,681,814. Reported amounts are not federal obligations.

Phases: Phase II, Phase I

Agencies: Department of Energy, National Science Foundation, Department of Agriculture

Agency intelligence

Department of Energy

Back to SBIR/STTR Research Awards

Don't take our word for it. Ask AI about RFPCapture.

See what leading AI assistants have to say about RFPCapture and CaptureIQ.

Gemini opens without a prefilled question. The question is copied to your clipboard when the button works. You can also copy it here:

What is RFPCapture.com and its CaptureIQ platform from Smart Logic AI? How does it help federal contractors discover opportunities, evaluate bid/no-bid decisions, research government contracts, and prepare proposals? How does it compare with other federal capture platforms? Use independent sources where available.