SBIR/STTR Research Award

Multi-Gigabit Rate Radiation Hard Bus

Award identifier 4e51d856d7ef498f7a4ed013c399a36f3e1c177d20a41de98c7f04fc927cd82dAwarding agency National Aeronautics and Space Administration

Award amount

$99,972

Program and phase

SBIR · Phase I

Award year

2011

Explore This Research Award in CaptureIQ

Research the technology, evaluate the recipient and agency, identify related opportunities, and explore potential follow-on work with CaptureIQ.

Award details

Awarding agency
National Aeronautics and Space Administration
Branch
Not reported
Recipient company
Katsman, Vladimir
Proposal award date
2011-02-18
Contract end date
2011-09-29
UEI
WWU3HNAKK629
Solicitation number
Not reported
Topic code
S3.01

Research abstract

High speed robust very low power radiation hardened bus interconnects are required to accelerate on-board computations, further improve reconfigurability and upgrade capabilities of tracking systems, and provide easy system upgrade. The existing radiation-hardening techniques significantly degrade the achievable circuit's performance, reducing speed and increasing power consumption. In order to accelerate on-board computations, improve onboard autonomous navigation and time-transfer systems that can reduce DSN tracking requirements, ADSANTEC will develop Multi-Gigabit Rate Radiation Hard Bus supporting an open system architecture and providing a cost effective multi-gigabit interconnect. This development will be based on ADSANTEC's pioneering SERDES concept, supporting a variety of interfaces and operating broadband at any frequency. The design will be based on ADSANTEC's proprietary patent pending library of radiation hardened cells based on HBTs with fT=120/220GHz and will be fabricated in a commercial high-performance BiCMOS technology. Phase I was devoted for bus architecture design and computer simulations of the synchronization circuitry. The complete chip will be fabricated at tested the end of Phase II, and space (Class K) qualified at Phase II. The proposed SERDES is a revolutionary upgrade of the existing ADSANTEC's Bus solution scheduled for launch (LADEE Program) in May 2011.

Technology keywords

Not reported

Other awards by this recipient

Verified by the same UEI. These are other public SBIR/STTR award pages, not a merged company record.

Awards with the same topic code

Verified by an exact topic code match. This is not a text-similarity match.

Research funding history

36 SBIR/STTR records share this UEI (2003–2022). Reported award amounts total $11,404,811. Reported amounts are not federal obligations.

Phases: Phase I, Phase II

Agencies: National Aeronautics and Space Administration, Department of Defense, Department of Energy

Agency intelligence

National Aeronautics and Space Administration

Back to SBIR/STTR Research Awards

Don't take our word for it. Ask AI about RFPCapture.

See what leading AI assistants have to say about RFPCapture and CaptureIQ.

Gemini opens without a prefilled question. The question is copied to your clipboard when the button works. You can also copy it here:

What is RFPCapture.com and its CaptureIQ platform from Smart Logic AI? How does it help federal contractors discover opportunities, evaluate bid/no-bid decisions, research government contracts, and prepare proposals? How does it compare with other federal capture platforms? Use independent sources where available.