SBIR/STTR Research Award

Cost and Weight Optimization of a Missile Using a Genetic Algorithm

Award identifier 9e3b33b49bc2987fd358a14488bec04d67430cb499195411451244081257dcd9Awarding agency Department of Defense · Army

Award amount

$729,493

Program and phase

SBIR · Phase II

Award year

2006

Explore This Research Award in CaptureIQ

Research the technology, evaluate the recipient and agency, identify related opportunities, and explore potential follow-on work with CaptureIQ.

Award details

Awarding agency
Department of Defense
Branch
Army
Recipient company
NEXTGEN AERONAUTICS, INC.
Proposal award date
2006-08-24
Contract end date
2008-08-31
UEI
ZKMCL2QBEN46
Solicitation number
2005.2
Topic code
A05-158

Research abstract

The cost incurred in developing and producing a product or process is one of the most important considerations. Surprisingly enough, cost planning is done only at the top-level. At the design-level of the parts and sub-systems, cost consideration happen in a very limited manner. Decisions at the design level are solely based on performance criteria. This tends to make the system either over costly or it does not utilize the given resources for the fear of overrunning it. Furthermore, it relies heavily on the experience of the involved people. This paradigm needs to be changed by incorporating cost knowledge at the early design stage. This can be done by developing a software tool that can easily and accurately estimate the cost of producing a system made of wide variety of parts either obtained from a third-party vendor or made in-house using different manufacturing processes. This will let a user treat cost as an independent parameter along with other performance parameters for a cost-based design optimization. A survey of existing software tool shows that there is no commercially available tool in today’s market with this functionality. This proposed work will essentially try to fill this important technological gap. It will 1) give cost estimate for each part (manufacturing and COTS) and of the system as a whole, 2) provide design alternatives based on cost and performance criteria, and 3) present the trade-offs of production scenarios (process, material, labor hours, tooling, etc).

Technology keywords

Not reported

Other awards by this recipient

Verified by the same UEI. These are other public SBIR/STTR award pages, not a merged company record.

Awards with the same topic code

Verified by an exact topic code match. This is not a text-similarity match.

Research funding history

128 SBIR/STTR records share this UEI (2003–2026). Reported award amounts total $45,716,575. Reported amounts are not federal obligations.

Phases: Phase I, Phase II, Phase II – Direct to Phase II

Agencies: Department of Defense, National Aeronautics and Space Administration, Department of Energy

Agency intelligence

Department of Defense

Back to SBIR/STTR Research Awards

Don't take our word for it. Ask AI about RFPCapture.

See what leading AI assistants have to say about RFPCapture and CaptureIQ.

Gemini opens without a prefilled question. The question is copied to your clipboard when the button works. You can also copy it here:

What is RFPCapture.com and its CaptureIQ platform from Smart Logic AI? How does it help federal contractors discover opportunities, evaluate bid/no-bid decisions, research government contracts, and prepare proposals? How does it compare with other federal capture platforms? Use independent sources where available.