SBIR/STTR Research Award

Techniques for Radiation Hardening of EKV through Incorporaton of Shielding in Component Structures Fabricated from Be/Be Alloy Substitute Materials

Award identifier be5c1b8d109a1548b1092be3939e31a8357f20a8ead0b861b397ee4b6c652981Awarding agency Department of Defense · Missile Defense Agency

Award amount

$749,994

Program and phase

STTR · Phase II

Award year

2005

Explore This Research Award in CaptureIQ

Research the technology, evaluate the recipient and agency, identify related opportunities, and explore potential follow-on work with CaptureIQ.

Award details

Awarding agency
Department of Defense
Branch
Missile Defense Agency
Recipient company
SCIMITAR TECHNOLOGIES LLC
Proposal award date
2005-09-26
Contract end date
2007-09-25
UEI
KV8EFBW5K865
Solicitation number
Not reported
Topic code
MDA04-T012

Research abstract

Beryllium has been the material of choice for many Exoatmospheric Kill Vehicle (EKV) components due to its desirable physical characteristics despite its health hazard concerns and high cost. However, beryllium has poor radiation shielding properties against x-ray, gamma ray and space radiation. Parasitic radiation shielding materials must be used in conjunction with beryllium where radiation shielding is required. The use of radiation shielding materials adds manufacturing cost and mass to the EKV. Innovative materials and designs are required that can reduce EKV component cost and mass, while incorporating radiation shielding directly into the EKV component. This project proposes to design, fabricate, test and qualify radiation hardened composite EKV components to replace beryllium/radiation shielding material combinations used in current EKV components. The use of radiation hardened composite materials will allow for the design of lower cost, lighter weight EKV components, that can provide the same structural strength and stiffness as beryllium components while incorporating equivalent radiation shielding directly into the EKV component. Significant cost and weight savings were demonstrated during Phase I by replacing the current gold plated beryllium EKV sensor sunshade design with a radiation hardened composite sunshade design.

Technology keywords

Not reported

Other awards by this recipient

Verified by the same UEI. These are other public SBIR/STTR award pages, not a merged company record.

Awards with the same topic code

Verified by an exact topic code match. This is not a text-similarity match.

Research funding history

12 SBIR/STTR records share this UEI (2004–2018). Reported award amounts total $3,827,290. Reported amounts are not federal obligations.

Phases: Phase I, Phase II

Agencies: Department of Defense

Agency intelligence

Department of Defense

Back to SBIR/STTR Research Awards

Don't take our word for it. Ask AI about RFPCapture.

See what leading AI assistants have to say about RFPCapture and CaptureIQ.

Gemini opens without a prefilled question. The question is copied to your clipboard when the button works. You can also copy it here:

What is RFPCapture.com and its CaptureIQ platform from Smart Logic AI? How does it help federal contractors discover opportunities, evaluate bid/no-bid decisions, research government contracts, and prepare proposals? How does it compare with other federal capture platforms? Use independent sources where available.