SBIR/STTR Research Award

Extended Lifetime Low Power Hall Thrusters

Award identifier 61d2a812fa6e6c6f045ddc8d522e94f8ebb1127d8b93d29b542774ffe55a5918Awarding agency Department of Defense · Air Force

Award amount

$749,211

Program and phase

SBIR · Phase II

Award year

2004

Explore This Research Award in CaptureIQ

Research the technology, evaluate the recipient and agency, identify related opportunities, and explore potential follow-on work with CaptureIQ.

Award details

Awarding agency
Department of Defense
Branch
Air Force
Recipient company
BUSEK CO., INC.
Proposal award date
2004-08-23
Contract end date
2006-08-23
UEI
SATYSBWG3FL7
Solicitation number
2003.2
Topic code
OSD03-008

Research abstract

Busek's 200 W Hall thruster has been flight qualified for the TechSat 21 program and more recently for the RoadRunner Program. During life testing conducted at AFRL the BHT-200 operation was approximately 900 hours less than the Phase II IHPRPT Goal of approximately 1000 hours. Concurrent with the IHPRPT demonstration test, Busek identified several design modifications in the Phase I SBIR that lessen the erosion of the dielectric insulators. Based on measured erosion profiles during 500 hours of testing, the extrapolated life of the extended lifetime thruster is 1500-2000 hours. Many emerging Space Test Program (STP), and orbit transfer missions require lifetime magnitudes of 3000 hours. Therefore, the focus of the Phase II effort is to extend the lifetime of the BHT-200 to 3000 hours making it attractive to a broader range of users. In the Phase II, Busek will continue with design modifications, primarily to the neutral flow distribution and magnetic field profiles that minimize the impingement of ions onto the insulator surfaces. In parallel, sputter resistant materials will be evaluated as substitutes to the baseline boron nitride. At the conclusion of the Phase II program, Busek will build an engineering model thruster and conduct an accelerated life test using results from a lifetime model being developed by our subcontractor MIT to predict erosion rates. Pending a positive outcome of the accelerated lifetime prediction/validation the thruster will be transferred to AFRL for continued life testing.

Technology keywords

Not reported

Other awards by this recipient

Verified by the same UEI. These are other public SBIR/STTR award pages, not a merged company record.

Awards with the same topic code

Verified by an exact topic code match. This is not a text-similarity match.

Research funding history

248 SBIR/STTR records share this UEI (1988–2026). Reported award amounts total $87,675,405. Reported amounts are not federal obligations.

Phases: Phase I, Phase II, Phase II – Direct to Phase II

Agencies: Department of Defense, National Aeronautics and Space Administration, Department of Energy, National Science Foundation

Agency intelligence

Department of Defense

Back to SBIR/STTR Research Awards

Don't take our word for it. Ask AI about RFPCapture.

See what leading AI assistants have to say about RFPCapture and CaptureIQ.

Gemini opens without a prefilled question. The question is copied to your clipboard when the button works. You can also copy it here:

What is RFPCapture.com and its CaptureIQ platform from Smart Logic AI? How does it help federal contractors discover opportunities, evaluate bid/no-bid decisions, research government contracts, and prepare proposals? How does it compare with other federal capture platforms? Use independent sources where available.