SBIR/STTR Research Award

Extended Lifetime Low Power Hall Thrusters

Award identifier 40862dfd674affca7bb8d774ee6486f41b77d8e7a4d4217b0aae622143821f94Awarding agency Department of Defense · Air Force

Award amount

$99,996

Program and phase

SBIR · Phase I

Award year

2003

Explore This Research Award in CaptureIQ

Research the technology, evaluate the recipient and agency, identify related opportunities, and explore potential follow-on work with CaptureIQ.

Award details

Awarding agency
Department of Defense
Branch
Air Force
Recipient company
BUSEK CO., INC.
Proposal award date
Not reported
Contract end date
Not reported
UEI
SATYSBWG3FL7
Solicitation number
Not reported
Topic code
Not reported

Research abstract

The Air Force has identified low power Hall thrusters as critical for mass and power limited satellites. Propulsion requirements include, maneuvering, precise formation flying, stationkeeping and extensive drag make-up. Busek's 200 W Hall thruster hasthe demonstrated performance characteristics of pulse operation and high thrust efficiency and specific impulse to provide all microsatellite propulsion needs. However, system lifetimes greater than 3000 hours are envisioned to meet mission needs forinspection, servicing and sparse aperture formation flying. At present, Busek's 200 W Hall thruster has not demonstrated this mission requirement.A Hall thruster's operating lifetime is dictated by sputter erosion of surfaces in contact with the high-energy ion beam. The highest erosion rates typically occur on the insulator surfaces near the exit plane of the thruster.In the proposed Phase I program, we will improve the lifetime of our 200 W Hall thruster through a combination of magnetic field shaping, neutral flow distribution, improved sputter resistant materials and design changes to the discharge region of thethruster. Busek will also develop and validate a method for numerically predicting the lifetime of the thruster using advanced plasma simulations that track particles impacting the walls and account for erosion induced geometry changes to the dischargechannel over time.In Phase II, an upgraded design will be prepared and a 3000 hour lifetest performed. Busek's low power Hall thruster can fulfill all the propulsion needs on low mass and power limited microsatellites. Developing a long life thruster will open additional mission opportunities where long mission duration and/or continuous thrusting arerequisites. Also science and earth observation micro satellites that need extensive drag make-up (high DV) can be met with a long life thruster. The thruster could also be used for deorbiting of both small and large satellites at EOL as is now mandatedby recent regulations.

Technology keywords

Not reported

Other awards by this recipient

Verified by the same UEI. These are other public SBIR/STTR award pages, not a merged company record.

Research funding history

248 SBIR/STTR records share this UEI (1988–2026). Reported award amounts total $87,675,405. Reported amounts are not federal obligations.

Phases: Phase I, Phase II, Phase II – Direct to Phase II

Agencies: Department of Defense, National Aeronautics and Space Administration, Department of Energy, National Science Foundation

Agency intelligence

Department of Defense

Back to SBIR/STTR Research Awards

Don't take our word for it. Ask AI about RFPCapture.

See what leading AI assistants have to say about RFPCapture and CaptureIQ.

Gemini opens without a prefilled question. The question is copied to your clipboard when the button works. You can also copy it here:

What is RFPCapture.com and its CaptureIQ platform from Smart Logic AI? How does it help federal contractors discover opportunities, evaluate bid/no-bid decisions, research government contracts, and prepare proposals? How does it compare with other federal capture platforms? Use independent sources where available.