SBIR/STTR Research Award

Cost-Effective, High-Performance, High-Purity Niobium Superconducting Radio Frequency Cavities

Award identifier 52a6b6fa7833fb184ba8b95e0760e7166fbc41ed2ed36bd3906fa8ce3e7ea68dAwarding agency Department of Energy

Award amount

$99,998

Program and phase

SBIR · Phase I

Award year

2005

Explore This Research Award in CaptureIQ

Research the technology, evaluate the recipient and agency, identify related opportunities, and explore potential follow-on work with CaptureIQ.

Award details

Awarding agency
Department of Energy
Branch
Not reported
Recipient company
ULTRAMET
Proposal award date
Not reported
Contract end date
Not reported
UEI
N8ZRMWX85NZ6
Solicitation number
DE-FG01-04ER04-33
Topic code
45 a

Research abstract

78163S Superconducting radio frequency (RF) accelerating cavities provide high continuous wave operating fields while offering higher beam quality and reduced beam-cavity interaction for high-energy physics research. An efficient and cost-effective fabrication methodology for the large-scale production of superconducting RF cavities is needed for the rapidly expanding number of superconducting high-energy accelerator projects. This project will develop an efficient, cost-effective fabrication methodology to produce superconducting RF cavities via chemical vapor deposition (CVD). The methodology will eliminate, or substantially reduce, the need for electron beam welding, along with many other costly, time-consuming, and often performance-killing fabrication steps currently used in the production of superconducting RF cavities. Phase I will focus on developing a fabrication method for producing high-purity CVD niobium with net-mirror-shaped low surface roughness (Rq<30 nms) suitable for use in optimally performing solid niobium superconducting RF cavities. The efficacy of these efforts will be determined through mechanical testing and metallographic examination. Cost predictions for the potential large-scale production of solid niobium RF cavities via the newly developed fabrication techniques also will be developed. Phase II will include the production and testing of at least two high-purity solid niobium superconducting RF cavities using the new technology. Commercial Applications and Other Benefits as described by the awardee: The methodology should have application to all particle accelerators, the tool of choice for fields as diverse as ion implantation, high-energy physics, surface analysis, medical treatment, waste sterilization, airport security, food preservation, spallation neutron physics, and coherent light research.

Technology keywords

Not reported

Other awards by this recipient

Verified by the same UEI. These are other public SBIR/STTR award pages, not a merged company record.

Awards with the same topic code

Verified by an exact topic code match. This is not a text-similarity match.

Research funding history

380 SBIR/STTR records share this UEI (1983–2025). Reported award amounts total $105,154,309. Reported amounts are not federal obligations.

Phases: Phase I, Phase II, Phase II – Direct to Phase II

Agencies: Department of Defense, National Aeronautics and Space Administration, Department of Energy, National Science Foundation, Department of Transportation, Department of Health and Human Services

Agency intelligence

Department of Energy

Back to SBIR/STTR Research Awards

Don't take our word for it. Ask AI about RFPCapture.

See what leading AI assistants have to say about RFPCapture and CaptureIQ.

Gemini opens without a prefilled question. The question is copied to your clipboard when the button works. You can also copy it here:

What is RFPCapture.com and its CaptureIQ platform from Smart Logic AI? How does it help federal contractors discover opportunities, evaluate bid/no-bid decisions, research government contracts, and prepare proposals? How does it compare with other federal capture platforms? Use independent sources where available.