SBIR/STTR Research Award

SUPERCONDUCTING MAGNET DEVELOPMENT FOR COMPACT STORAGE RINGS

Award identifier fa7251dbaf74abfb472234e8f1675580c9c055ea4bb4921fc7f93432c3165facAwarding agency Department of Energy

Award amount

$75,000

Program and phase

SBIR · Phase I

Award year

1994

Explore This Research Award in CaptureIQ

Research the technology, evaluate the recipient and agency, identify related opportunities, and explore potential follow-on work with CaptureIQ.

Award details

Awarding agency
Department of Energy
Branch
Not reported
Recipient company
PARTICLE BEAM LASERS, INC.
Proposal award date
Not reported
Contract end date
Not reported
UEI
CHPCR17Y8LK3
Solicitation number
Not reported
Topic code
Not reported

Research abstract

THIS PROJECT WILL STUDY AND DEVELOP A TYPE OF HIGH FIELD SUPERCONDUCTING MAGNET FOR POSITRON-ELECTRON COLLIDERS, DAMPING RINGS FOR THE NEXT LINEAR COLLIDER, AND A COMPACT SYNCHROTRON LIGHT SOURCE WITH X-RAY ENERGIES BETWEEN 15 AND 33 KEV. THE PHASE I STUDY WILL IDENTIFY A SUPERCONDUCTING MAGNET CONFIGURATION THAT WILL SATISFY THE REQUIREMENTS OF A DIPOLE MAGNET OF A COMPACT STORAGE RING BASED ON THE VOBLY DESIGN AND TEST THE SUITABILITY OF THIS MAGNET IN A SPECIFIC STORAGE RING EXAMPLE. THE CONFIGURATION WILL CONSIST OF THE GEOMETRY OF THE IRON POLES, THE SHAPE AND LOCATIONS OF THE COILS, THE REQUIRED RELATIONSHIPS OF THE CURRENTS IN THE INDEPENDENT COILS, AND THE MAGNETIC MULTIPOLE FUNCTIONS AS A FUNCTION OF POSITION AND CURRENTS. IN ADDITION TO MAGNET DESIGN STUDIES, THE EFFORT WILL ALSO CONSIDER OTHER ASPECTS OF THE STORAGE RING INCLUDING THE LATTICE, QUADRUPOLES, VACUUM, RADIO FREQUENCY, AND INJECTION SYSTEMS. A PRELIMINARY ESTIMATE OF THE MAGNET COST AND STORAGE RING COST WILL BE MADE.

Technology keywords

Not reported

Other awards by this recipient

Verified by the same UEI. These are other public SBIR/STTR award pages, not a merged company record.

Research funding history

22 SBIR/STTR records share this UEI (1986–2022). Reported award amounts total $5,923,734. Reported amounts are not federal obligations.

Phases: Phase I, Phase II

Agencies: Department of Energy

Agency intelligence

Department of Energy

Back to SBIR/STTR Research Awards

Don't take our word for it. Ask AI about RFPCapture.

See what leading AI assistants have to say about RFPCapture and CaptureIQ.

Gemini opens without a prefilled question. The question is copied to your clipboard when the button works. You can also copy it here:

What is RFPCapture.com and its CaptureIQ platform from Smart Logic AI? How does it help federal contractors discover opportunities, evaluate bid/no-bid decisions, research government contracts, and prepare proposals? How does it compare with other federal capture platforms? Use independent sources where available.