SBIR/STTR Research Award

Rapid Prediction of Long Range Wakefields for Beam Impedance and Power Loading in Complex Accelerator Structures

Award identifier ce0dcae95707de1932cd36fa51c81bf7b65dbeb3eb6335b454396d91351d69daAwarding agency Department of Energy

Award amount

$99,665

Program and phase

SBIR · Phase I

Award year

2009

Explore This Research Award in CaptureIQ

Research the technology, evaluate the recipient and agency, identify related opportunities, and explore potential follow-on work with CaptureIQ.

Award details

Awarding agency
Department of Energy
Branch
Not reported
Recipient company
TECH-X CORPORATION
Proposal award date
Not reported
Contract end date
Not reported
UEI
VJ7GKNR3MEM3
Solicitation number
DE-PS02-08ER08-34
Topic code
46 c

Research abstract

The successful design and operation of accelerating structures depends on understanding how particles excite extraneous signals (wake fields) as they pass through the structures. The wake fields are a complicated superposition of hundreds to sometimes thousands of oscillating electromagnetic modes, which in turn can depend critically on detailed aspects of the cavity and coupler shapes. Wake fields can lead to undesirable emittance growth, instability within subsequent bunches, undesirable high-order modes (HOMs), and undesirably large power loading. The use of computational models to predict wake field behavior is quite challenging, as existing tools and techniques are insufficient for the task, or require impractically long run times. This project will combine two approaches ¿ (1) augmenting existing parallel processing software with the Time-Domain Extrapolation Method, and (2) applying and evaluating the recently demonstrated and validated Filter Diagonalization mode-analysis technique ¿ to speed up the computation of wake fields for nuclear physics accelerator cavities. Both approaches will be used to compute a quantity called the Beam Impedance, which characterizes the wake fields seen by a given bunch, due to the passage through the cavity of preceding bunches. Commercial Applications and other Benefits as described by the awardee The development of a wake field computational capability would have a major positive impact on cavity design, which is critical for accelerator facilities throughout the DOE portfolio. A better design capability would lead to higher current beams with less wake field losses.

Technology keywords

Not reported

Other awards by this recipient

Verified by the same UEI. These are other public SBIR/STTR award pages, not a merged company record.

Awards with the same topic code

Verified by an exact topic code match. This is not a text-similarity match.

Research funding history

299 SBIR/STTR records share this UEI (1994–2025). Reported award amounts total $109,779,617. Reported amounts are not federal obligations.

Phases: Phase I, Phase II, Phase II – Direct to Phase II

Agencies: Department of Energy, Department of Defense, National Aeronautics and Space Administration, Department of Education, Department of Commerce

Agency intelligence

Department of Energy

Back to SBIR/STTR Research Awards

Don't take our word for it. Ask AI about RFPCapture.

See what leading AI assistants have to say about RFPCapture and CaptureIQ.

Gemini opens without a prefilled question. The question is copied to your clipboard when the button works. You can also copy it here:

What is RFPCapture.com and its CaptureIQ platform from Smart Logic AI? How does it help federal contractors discover opportunities, evaluate bid/no-bid decisions, research government contracts, and prepare proposals? How does it compare with other federal capture platforms? Use independent sources where available.