Electrical Transmission Cable to Shore for a 100MW Floating OTEC Electrical Power Plant
Award amount
$99,789Program and phase
SBIR · Phase IAward year
2009Award details
- Awarding agency
- Department of Energy
- Branch
- Not reported
- Recipient company
- MAKAI OCEAN ENGINEERING INC
- Proposal award date
- Not reported
- Contract end date
- Not reported
- UEI
- GVLGK73C9DM1
- Solicitation number
- DE-PS02-08ER08-34
- Topic code
- 19 b
Research abstract
Technology keywords
Not reported
Other awards by this recipient
Verified by the same UEI. These are other public SBIR/STTR award pages, not a merged company record.
- Surface Wave Integrated Sensor System (SWISS)
- NEMO ñ Nautical ElectroMagnetic Observer
- Resilient and Rapidly Restorable Cabled Communications (R3C2)
- Autonomous Subsea Cabling and Connection System
- Resilient and Rapidly Restorable Cabled Communications (R3C2)
Awards with the same topic code
Verified by an exact topic code match. This is not a text-similarity match.
- SOFC Protection Coatings Based on a Cost-Effective Aluminization Process
- Low Cost Spray-On Coatings for Protection of SOFC Interconnects and BOP Components
- Low Level Radioactive Xenon Monitoring by Phoswich Detector System
Research funding history
51 SBIR/STTR records share this UEI (1999–2025). Reported award amounts total $27,377,557. Reported amounts are not federal obligations.
Phases: Phase I, Phase II
Agencies: Department of Defense, Department of Energy