SBIR/STTR Research Award

Development of an SRF Crab Crossing Cavity for an Electron Ion Collider

Award identifier 0f9e6e21cafb40fc385841caade8d705e4be162451c4b6d8986d9b0f59a0b15fAwarding agency Department of Energy

Award amount

$100,000

Program and phase

STTR · Phase I

Award year

2010

Explore This Research Award in CaptureIQ

Research the technology, evaluate the recipient and agency, identify related opportunities, and explore potential follow-on work with CaptureIQ.

Award details

Awarding agency
Department of Energy
Branch
Not reported
Recipient company
Niowave, Inc.
Proposal award date
Not reported
Contract end date
2011-03-18
UEI
WJLJSN2AT8P1
Solicitation number
DE-FOA-0000161
Topic code
45 c

Research abstract

The highest priority in the Nuclear Physics program is, at present, the Facility for Rare Isotope Beams. In the longer term it is likely that a high priority will be an Electron Ion Collider, and several concepts are under development. In order to achieve the high luminosities that would be required to make such a machine attractive, some kind of bunch crabbing system will be required. For example, the Electron Ion Collider under study at Jefferson Lab would require a crabbing voltage between 20 and 50 MV at either 499 or 1497 MHz. RF crabbing systems are important components in linear colliders where the beams meet at an angle. A crabbing system rotates the bunches at the collision point so they meet head-on, instead of crossing at an angle, thus restoring and increasing the luminosity. The requirements for a crabbing system for an Electron Ion Collider, as envisaged at Jefferson Lab, are quite stringent, exceeding what has been accomplished so far. A crabbing system could, in principle, be built using room temperature cavities. However, in order to produce the needed voltage a large number of cavities and their associated rf power system would be required. An attractive alternative solution would be based on a superconducting cavity of a new design that has been introduced recently. This new design, if optimized for this application, could provide the required deflecting voltage in a footprint that would be compatible with the design of the interaction regions. Commercial Applications and Other Benefits: This STTR research would continue ODU, JLab, and Niowave

Technology keywords

Not reported

Other awards by this recipient

Verified by the same UEI. These are other public SBIR/STTR award pages, not a merged company record.

Awards with the same topic code

Verified by an exact topic code match. This is not a text-similarity match.

Research funding history

58 SBIR/STTR records share this UEI (2007–2020). Reported award amounts total $27,594,609. Reported amounts are not federal obligations.

Phases: Phase I, Phase II

Agencies: Department of Energy, Department of Defense, Department of Homeland Security

Agency intelligence

Department of Energy

Back to SBIR/STTR Research Awards

Don't take our word for it. Ask AI about RFPCapture.

See what leading AI assistants have to say about RFPCapture and CaptureIQ.

Gemini opens without a prefilled question. The question is copied to your clipboard when the button works. You can also copy it here:

What is RFPCapture.com and its CaptureIQ platform from Smart Logic AI? How does it help federal contractors discover opportunities, evaluate bid/no-bid decisions, research government contracts, and prepare proposals? How does it compare with other federal capture platforms? Use independent sources where available.