SBIR/STTR Research Award

Hardware Modeler Replacement for Digital Device Simulation

Award identifier bfabdf71bd829d1d371cd1368cd07320e126cdbe7c147c79fd118a7d388c4c5fAwarding agency Department of Defense · Air Force

Award amount

$1,193,793

Program and phase

SBIR · Phase II

Award year

2024

Explore This Research Award in CaptureIQ

Research the technology, evaluate the recipient and agency, identify related opportunities, and explore potential follow-on work with CaptureIQ.

Award details

Awarding agency
Department of Defense
Branch
Air Force
Recipient company
INTEGRATED TEST SOLUTIONS, INC.
Proposal award date
2024-06-25
Contract end date
2026-06-24
UEI
KN5ABKL24BN9
Solicitation number
17.2
Topic code
AF172-005

Research abstract

The Air Force has an immediate need for replacement of obsolete D300 Hardware Modeling Systems. These systems are critical to the successful development and support of test programs at numerous Department of Defense locations. Integrated Test Solutions will complete the development of a fully functional D300 replacement system utilizing commercially available digital test hardware. All D300 Hardware Modeling legacy hardware will be replaced by new hardware and software designs. The effort to complete the design of the Next Generation Hardware Modeler will continue the design efforts started under the SBIR topic AF172-005 (Phase I, II), and current Phase III award. This will include a market ready Next Generation Modeler based on the Prototype being built in the Phase III award. This will solve the Air Force’s most critical obsolescence issues for LASAR Hardware modeling. The current prototype effort will replace the system controller, pattern generator, timing generator, and VMS/UNIX based computing system with modern new Teradyne HS-SUB eDigital resources. It will also replace the legacy power systems with modern power supplies. The proposed TACFI effort will be to advance the design of the Next Generation Hardware Modeler development prototype into a completely redesigned, modern Hardware Modeler. This effort will build on the previous efforts by replacing all legacy D300 components including the DUS Card rack, DA101 interface cards, and the system backplane. The results will be a brand new ready for production hardware modeler that is 100% compatible with Teradyne’s LASAR simulation environment and all existing legacy DUS Cards/Hardware Models.The final development phase of this SBIR/TACFI effort will be to design new modern hardware model DUS Cards. The current Teradyne cards are in short supply and have been out of production for years. They contain many obsolete components and connectors. The final obsolescence issue with LASAR hardware modeling will be the update and replacement of the DUS card with a modern assembly that can be purchased by the Next Generation Hardware Modeler customer to develop new component hardware models for complex devices in LASAR simulations. The Next Generation Modeler with new DUS Cards will remove 100% of the obsolescence of the Teradyne D300 and be sustainable for the foreseeable future. This effort will conclude with ITS manufacturing the first complete Next Generation Modeler. Once fabricated ITS will extensively test the unit and perform operational comparisons with the legacy D300 to verify all of the design criteria are met. The unit will be validated using a defined factory acceptance test procedure. At the conclusion of this effort, the Next Generation Hardware Modeler be ready for commercial production units and sale to the DAF, other branches of the DoD, and commercial entities.

Technology keywords

Not reported

Other awards by this recipient

Verified by the same UEI. These are other public SBIR/STTR award pages, not a merged company record.

Awards with the same topic code

Verified by an exact topic code match. This is not a text-similarity match.

Research funding history

5 SBIR/STTR records share this UEI (1995–2024). Reported award amounts total $2,734,743. Reported amounts are not federal obligations.

Phases: Phase II, Phase I

Agencies: Department of Defense

Agency intelligence

Department of Defense

Back to SBIR/STTR Research Awards

Don't take our word for it. Ask AI about RFPCapture.

See what leading AI assistants have to say about RFPCapture and CaptureIQ.

Gemini opens without a prefilled question. The question is copied to your clipboard when the button works. You can also copy it here:

What is RFPCapture.com and its CaptureIQ platform from Smart Logic AI? How does it help federal contractors discover opportunities, evaluate bid/no-bid decisions, research government contracts, and prepare proposals? How does it compare with other federal capture platforms? Use independent sources where available.