Sensor Fusion for Additive Manufacturing In-situ Inspection
Award amount
$109,995Program and phase
STTR · Phase IAward year
2024Award details
- Awarding agency
- Department of Defense
- Branch
- Air Force
- Recipient company
- ADDITIVE MONITORING, INC.
- Proposal award date
- 2024-05-16
- Contract end date
- 2024-08-19
- UEI
- ULBTJK8NGM91
- Solicitation number
- X24.D
- Topic code
- AFX24D-PTCSO1
Research abstract
Technology keywords
Not reported
Other awards by this recipient
Verified by the same UEI. These are other public SBIR/STTR award pages, not a merged company record.
- In-Situ Monitoring for Blown Powder Additive Manufacturing
- Closed Loop Adaptive Laser Pathing for Additive Manufacturing
- In-situ Monitoring for Blown Powder Additive Manufacturing
- Project Fringe USAF: A Real-Time Monitoring System to Qualify and Certify Additive Manufacturing Aerospace Components
- In-situ Monitoring System for Additive Manufacturing Quality Control
Awards with the same topic code
Verified by an exact topic code match. This is not a text-similarity match.
- Conformable High Energy Density LiS Battery as Power Source for Unmanned Air Vehicles and Directed Energy Weapons
- Improved Weather Information for Non-Traditional and Resilient Sensing
- TALON (Tactical Adaptive Layer for Operational Nexus)
- Handheld Robotic Device for Difficult Tracheal Intubation
- Multi-Purpose Long Endurance UAV Payload Pod for Austere Operations
Research funding history
6 SBIR/STTR records share this UEI (2022–2024). Reported award amounts total $2,734,601. Reported amounts are not federal obligations.
Phases: Phase I, Phase II – Direct to Phase II, Phase II
Agencies: Department of Defense