SBIR/STTR Research Award

Scalable, Variable-speed Time-Sensitive Ethernet

Award identifier 3eedbe45097240be328e9e4add4080b8d4c7b122692bf776afd4b6213b761f27Awarding agency National Aeronautics and Space Administration

Award amount

$159,990

Program and phase

SBIR · Phase I

Award year

2023

Explore This Research Award in CaptureIQ

Research the technology, evaluate the recipient and agency, identify related opportunities, and explore potential follow-on work with CaptureIQ.

Award details

Awarding agency
National Aeronautics and Space Administration
Branch
Not reported
Recipient company
LEWIZ COMMUNICATIONS, INC.
Proposal award date
2023-06-30
Contract end date
2024-02-02
UEI
CXVDG7SBHFN3
Solicitation number
SBIR_23_P1
Topic code
Z2

Research abstract

Time critical data requires low latency and deterministicnbsp;transfer. Sensor, command and control data of mission-critical, high-reliability, real-time applications such as collision avoidance, avionics require on-time delivery. Flight control system, images from a camera of an autonomous system require real-time andnbsp;must be communicated deterministically for the system to function correctly. Autonomous systems such as unmanned ground, sea, air, space vehicles, robots, etc. and industrial automation control systems, all have requirements for deterministicnbsp;network.nbsp;Ethernet is ubiquitous. Itrsquo;s being used everywhere from small devices to high performance computing system. Its large ecosystemnbsp;provides key advantages such as low cost and high availability. However, data transferred via Ethernetnbsp;is ldquo;best-effortrdquo;nbsp;and may be buffered - causingnbsp;significant jitter and non-deterministic innbsp;delivery timing. Packets across Ethernet may be dropped by switch, routers -nbsp;delivery is not guaranteed. Solutions are required to overcome these problems. 2nbsp;standards have been defined by the industry fornbsp;time-critical applications: Time-triggered Ethernet (TTE)nbsp;and Time-Sensitive Network (TSN). Previously, LeWiznbsp;developed TTE IP core, FPGA and softwarenbsp;for use in endpoint and switching nodes. This proposal further extends the technology to includenbsp;TSN, which has a very large commercial potential. NASA also has specific requests for TSN in its SBIR Topicnbsp;including processor clustering, faultnbsp;tolerant, compatible with heterogeneous networks, support low-cost devices. The proposed core would support these requirements. In Phase 1, LeWiz willnbsp;enhance its existing TTE corenbsp;to support TSN, compliant tonbsp;IEEE standards for use in either endpoint or switching systems, scalable from 1 to 10/100Gbpsnbsp;and still maintain extreme timing accuracy. Thus, network products designed with this technology can benbsp;more versatile. Thisnbsp;corenbsp;provides many advantages and can also be used fornbsp;switching or SoC ASIC nbsp;

Technology keywords

Not reported

Other awards by this recipient

Verified by the same UEI. These are other public SBIR/STTR award pages, not a merged company record.

Research funding history

12 SBIR/STTR records share this UEI (2020–2025). Reported award amounts total $5,515,117. Reported amounts are not federal obligations.

Phases: Phase I, Phase II

Agencies: National Aeronautics and Space Administration, Department of Defense

Agency intelligence

National Aeronautics and Space Administration

Back to SBIR/STTR Research Awards

Don't take our word for it. Ask AI about RFPCapture.

See what leading AI assistants have to say about RFPCapture and CaptureIQ.

Gemini opens without a prefilled question. The question is copied to your clipboard when the button works. You can also copy it here:

What is RFPCapture.com and its CaptureIQ platform from Smart Logic AI? How does it help federal contractors discover opportunities, evaluate bid/no-bid decisions, research government contracts, and prepare proposals? How does it compare with other federal capture platforms? Use independent sources where available.