Lowering F135 Integrally Bladed Rotor Sustainment Costs with SmartBlend
Award amount
$749,130Program and phase
SBIR · Phase II – Direct to Phase IIAward year
2023Award details
- Awarding agency
- Department of Defense
- Branch
- Air Force
- Recipient company
- BLADE DIAGNOSTICS CORPORATION
- Proposal award date
- 2023-02-08
- Contract end date
- 2024-08-12
- UEI
- SV8XUL8L27J4
- Solicitation number
- X23.4
- Topic code
- AFX234-DCSO2
Research abstract
Technology keywords
Not reported
Other awards by this recipient
Verified by the same UEI. These are other public SBIR/STTR award pages, not a merged company record.
- In-situ Inlet and 1st Fan IBR Inspection for Advanced Aircraft
- In situ turbofan inspection for advanced aircraft
- Lowering F135 Integrally Bladed Rotor Sustainment Costs with SmartBlend
- Lowering Integrally Bladed Rotor Sustainment Costs Through Mistuning Characterization of Intentionally Mistuned Blades
- Lowering F135 Integrally Bladed Rotor Sustainment Costs with SmartBlend
Awards with the same topic code
Verified by an exact topic code match. This is not a text-similarity match.
- AeroISU: Real-time Visibility and Mission Readiness of Industrial Storage Units (ISU), Containers & other USAF Equipment
- Trans Astronautica’s Sutter Turn Key Observatory
- Quantum Secure Identification
- Low-Probability-of-Intercept Terahertz Communications for Air Force Applications
- Accrete Argonaut Sequential
Research funding history
18 SBIR/STTR records share this UEI (2005–2025). Reported award amounts total $9,526,264. Reported amounts are not federal obligations.
Phases: Phase I, Phase II, Phase II – Direct to Phase II
Agencies: Department of Defense