SBIR/STTR Research Award

Stand-alone accelerator system based on SRF quarter-wave resonators

Award identifier 9a84f2d7cb8cf31f21e971ac3b25af6048713169e1fe680fe68e2ec11bc4926fAwarding agency Department of Energy

Award amount

$1,149,979

Program and phase

SBIR · Phase II

Award year

2022

Explore This Research Award in CaptureIQ

Research the technology, evaluate the recipient and agency, identify related opportunities, and explore potential follow-on work with CaptureIQ.

Award details

Awarding agency
Department of Energy
Branch
Not reported
Recipient company
RADIABEAM TECHNOLOGIES, LLC
Proposal award date
2022-08-24
Contract end date
2024-08-23
UEI
Q6NDLV47NBT5
Solicitation number
Not reported
Topic code
C48-29c

Research abstract

Statement of the Problem SRF cavities are starting to be recognized as not only research devices but as devices that might be able to step in as an improved alternative to existing non-superconducting accelerator technology. The largest issue in fostering this change in applicable areas is the cost of the infrastructure and cytotechnology required when maintaining cryo-liquids. This cost has become synonymous with the term SRF cavity, limiting people’s perspective expectation from the technology. Further the few small cryomodules that have been developed have not invested in the level of analysis required for field deployment, instead focusing on building these delicate devices at their final test locations. Technical Approach In this project, we are designing and building a cryomodule that operates without any cryo-liquids utilizing cryocoolers and conductive cooling. This will eliminate the large expense of cryo-fluids and further reduce transportation concerns, since the cryomodule becomes just a vacuum device, not a potentially high- pressure vessel. We will also initiate design and fabrication of the other components needed for full demonstration, such as the cavity and RF coupler. Phase II progress to date In Phase II, we completed the deployable conductively cooled cryomodule design and we are well under way in fabrication. The design included consideration for mobility and will utilize a single cell 650 MHz conductively cooled cavity provided by Fermilab. The cryomodule currently supports up to four cryocoolers, but will only use one for a total of 2.5 watts of cooling power at 4.2K. We are assembling the cryomodule for final testing, which will take place at Fermilab. Phase IIA Plans In Phase IIA, the cryomodule will be further upgraded to support a permanent cavity in preparation for in use testing. This includes the initiation of multicell conductively cooled cavity design, with some fabrication process studies to develop the tooling to build the cavity. We will design and fabricate an appropriate RF power coupler to further fill out the cryomodule build. We will also further fill out the coldhead compliment to make this cryostat have a comfortable heat budget implicit with the dynamic loads we expect to see in operation with the new cavity. Commercial Applications and Other Benefits This device would have immediate benefit to existing SRF facilities now as an independent module utilized for capability expansion. This product would also address the desire of fostering compact SRF technology into industry and small laboratories. Some examples of typical areas of interest that would apply are: cargo inspection and security, food irradiation, bulk material treatment, and environmental issues such as waste water treatment.

Technology keywords

Not reported

Other awards by this recipient

Verified by the same UEI. These are other public SBIR/STTR award pages, not a merged company record.

Research funding history

190 SBIR/STTR records share this UEI (2004–2025). Reported award amounts total $96,783,846. Reported amounts are not federal obligations.

Phases: Phase I, Phase II, Phase II – Direct to Phase II

Agencies: Department of Energy, Department of Defense, Department of Homeland Security, National Science Foundation, Department of Health and Human Services, Department of Commerce

Agency intelligence

Department of Energy

Back to SBIR/STTR Research Awards

Don't take our word for it. Ask AI about RFPCapture.

See what leading AI assistants have to say about RFPCapture and CaptureIQ.

Gemini opens without a prefilled question. The question is copied to your clipboard when the button works. You can also copy it here:

What is RFPCapture.com and its CaptureIQ platform from Smart Logic AI? How does it help federal contractors discover opportunities, evaluate bid/no-bid decisions, research government contracts, and prepare proposals? How does it compare with other federal capture platforms? Use independent sources where available.