SBIR/STTR Research Award

Thermal Improvement on 1 Newton ASCENT Thruster Valve Assembly (TVA)

Award identifier 2ddc6acdb57dd5a815d841a40926757cc606546f0b353ed1ac3f8c741166a6feAwarding agency Department of Defense · Air Force

Award amount

$149,999

Program and phase

SBIR · Phase I

Award year

2022

Explore This Research Award in CaptureIQ

Research the technology, evaluate the recipient and agency, identify related opportunities, and explore potential follow-on work with CaptureIQ.

Award details

Awarding agency
Department of Defense
Branch
Air Force
Recipient company
BUSEK CO., INC.
Proposal award date
2022-07-08
Contract end date
2023-07-07
UEI
SATYSBWG3FL7
Solicitation number
21.2
Topic code
AF212-0011

Research abstract

Busek proposes to develop a novel thermal management system for its 1N ASCENT thruster valve assembly (TVA). Traditionally, monoprop thrusters rely on thermally conductive straps that shunt heat away from the injector tube or injector flange. Such passive configuration, although adequate for hydrazine thrusters, has proven difficult to implement for the new generation of green monoprop thrusters. This is because unlike hydrazine, green monoprops such as ASCENT are not capable of cold starts and require catbed preheat to >400oC. During catbed preheat, the thermal straps are inadvertently in contention with the catbed heater since they are constant heat sinks. For many thruster designers, this is an accepted limitation, and they are often forced to oversize the thermal straps for the worst thermal-load scenario (i.e., steady-state firing). This causes several issues, such as significant increase in catbed heater power and energy consumption, in order to overcome the large thermal shunt during preheat. The longer heater ON time also prevents responsive start from cold. Furthermore, passive thermal straps may be too slow to counteract post-firing soak-backs, which in certain situations can cause a thruster to fail upon shut down or during hot restarts. Having experienced these thermal difficulties first hand, Busek plans to develop a thermal switch mechanism for an ASCENT thruster that would allow for 2x faster catbed preheat, reduction of preheat energy consumption, and better protection on the injector feed tube. The Phase I work will leverage Busek’s existing 1N TVA hardware known as BGT-1, which includes Busek’s patented catbed design and a custom titanium micro-solenoid valve. At the conclusion of the Phase I effort, the new BGT-1 TVA will be thermally tested in vacuum to fully characterize the new thermal management system under a nominal catbed preheat condition. It will be ready for hot fire tests at the beginning of Phase II.

Technology keywords

Not reported

Other awards by this recipient

Verified by the same UEI. These are other public SBIR/STTR award pages, not a merged company record.

Research funding history

248 SBIR/STTR records share this UEI (1988–2026). Reported award amounts total $87,675,405. Reported amounts are not federal obligations.

Phases: Phase I, Phase II, Phase II – Direct to Phase II

Agencies: Department of Defense, National Aeronautics and Space Administration, Department of Energy, National Science Foundation

Agency intelligence

Department of Defense

Back to SBIR/STTR Research Awards

Don't take our word for it. Ask AI about RFPCapture.

See what leading AI assistants have to say about RFPCapture and CaptureIQ.

Gemini opens without a prefilled question. The question is copied to your clipboard when the button works. You can also copy it here:

What is RFPCapture.com and its CaptureIQ platform from Smart Logic AI? How does it help federal contractors discover opportunities, evaluate bid/no-bid decisions, research government contracts, and prepare proposals? How does it compare with other federal capture platforms? Use independent sources where available.