SBIR/STTR Research Award

High Output Pulsed Power Source

Award identifier 5a717d7be0c53eba3f148db589dd65acb6de62eb25063916cb9cbee5d1405c85Awarding agency Department of Energy

Award amount

$199,822

Program and phase

SBIR · Phase I

Award year

2021

Explore This Research Award in CaptureIQ

Research the technology, evaluate the recipient and agency, identify related opportunities, and explore potential follow-on work with CaptureIQ.

Award details

Awarding agency
Department of Energy
Branch
Not reported
Recipient company
RADIABEAM TECHNOLOGIES, LLC
Proposal award date
2021-02-22
Contract end date
2021-11-21
UEI
Q6NDLV47NBT5
Solicitation number
Not reported
Topic code
37c

Research abstract

The requirements on the driving pulse for Electron-Ion Collider (EIC) kickers include extremely high peak voltage of +/-50 kV (dual-channel) to be dissipated in a 50 Ohm kicker impedance, which brings operation peak current level to ~ 1kA. Existing drivers (pulsers) are operating at only a few kilovolts, and most of them utilize HV MOSFET switches, using single switch per each channel. However, one problem with MOSFET transistors is due to their residual resistance (on the order of several tens of Ohms), which dramatically limits their efficiency. Thus, a state-of-the-art MOSFET approach is not applicable for the EIC kickers system due to low efficiency, instability, high voltage requirements, and other solutions are sought. In response to this problem, RadiaBeam Technologies proposes to develop and test a high output pulse generator based on distributed pulser topology that will utilize novel GaN transistors as switching devices. GaN is a rapidly growing transistor platform, which enables both high peak and average power operations along with extremely short switching times of nanosecond-scale, well within very tight margins on the rise and fall times of EIC kickers. In Phase I, we will perform a thorough pulser topology optimization, resulting in an optimal combination of parallel switching sub-elements – we will find the right balance between a number of sub-elements and their individual power levels, in the context of the system performance, complexity, footprint, heat management, and power combining scheme. We will also assemble and test the switch to validate the proof-of-principle and show the scalability to 50 kV in the developed system topology. Phase I development efforts will be a starting point for actual fabrication, assembly, and high-power testing of the complete pulser system in Phase II. In addition to primary user of the system proposed herein (EIC at Brookhaven National Lab), the variants of the developed high voltage nanosecond pulser may find various applications involving HV switches or high frequency power in national laboratories, including fast beam choppers, next generation light sources using energy recovery linacs (ERLs), ion clearing gaps for ion beams, and FET-driven replacement of radio frequency quadrupole (RFQ) accelerating structures. Other important applications of high voltage pulsers include: high power laser technology (i.e. to drive Pockels cells), manipulation and control of non-equilibrium plasmas, as well as for EMC/HIRF testing of critical equipment and processes.

Technology keywords

Not reported

Other awards by this recipient

Verified by the same UEI. These are other public SBIR/STTR award pages, not a merged company record.

Awards with the same topic code

Verified by an exact topic code match. This is not a text-similarity match.

Research funding history

190 SBIR/STTR records share this UEI (2004–2025). Reported award amounts total $96,783,846. Reported amounts are not federal obligations.

Phases: Phase I, Phase II, Phase II – Direct to Phase II

Agencies: Department of Energy, Department of Defense, Department of Homeland Security, National Science Foundation, Department of Health and Human Services, Department of Commerce

Agency intelligence

Department of Energy

Back to SBIR/STTR Research Awards

Don't take our word for it. Ask AI about RFPCapture.

See what leading AI assistants have to say about RFPCapture and CaptureIQ.

Gemini opens without a prefilled question. The question is copied to your clipboard when the button works. You can also copy it here:

What is RFPCapture.com and its CaptureIQ platform from Smart Logic AI? How does it help federal contractors discover opportunities, evaluate bid/no-bid decisions, research government contracts, and prepare proposals? How does it compare with other federal capture platforms? Use independent sources where available.