Composite-based additive manufacturing
Award amount
$49,996Program and phase
STTR · Phase IAward year
2021Award details
- Awarding agency
- Department of Defense
- Branch
- Air Force
- Recipient company
- IMPOSSIBLE OBJECTS, INC.
- Proposal award date
- 2021-02-18
- Contract end date
- 2021-05-17
- UEI
- LJJ5XAB5VNG1
- Solicitation number
- X20.C
- Topic code
- AF20C-TCSO1
Research abstract
Technology keywords
Not reported
Other awards by this recipient
Verified by the same UEI. These are other public SBIR/STTR award pages, not a merged company record.
- High-Volume Low-Cost Long-range Fixed Wing UAS with near-conflict Distributed Manufacturability
- Near Expeditionary Advanced Manufacturing of Engine Cooling Fans for Wheeled Vehicles
- Optimization of High-Speed Post-Processing Equipment (TACFI)
- Low Cost Additive Manufacturing of Radiation Shielding Material & Structures
- Additively Manufactured Embedded Wiring Harnesses
Awards with the same topic code
Verified by an exact topic code match. This is not a text-similarity match.
- AI Powered Market Intelligence & Tech Scouting Recommendation Engine to Drive DoD Discovery and Engagement of an Innovative Industrial Supply Chain
- Enhanced Geothermal System
- Advanced Materials for Soft Robotics Assisted Non-Destructive Inspection
- Document Generation Platform (DGP)
- Light Weight Modular Perception Enhancement (LIMPET) TACFI Sequential Phase II
Research funding history
19 SBIR/STTR records share this UEI (2021–2025). Reported award amounts total $10,837,515. Reported amounts are not federal obligations.
Phases: Phase I, Phase II – Direct to Phase II, Phase II
Agencies: Department of Defense