SBIR/STTR Research Award

Development of Wakefield Accelerating Structures at Ultra-high Frequencies

Award identifier c3cb2d170e9a5695bd298f287020dd4595bdc4a16fd65737399a22da9bb74ee1Awarding agency Department of Energy

Award amount

$199,623

Program and phase

STTR · Phase I

Award year

2020

Explore This Research Award in CaptureIQ

Research the technology, evaluate the recipient and agency, identify related opportunities, and explore potential follow-on work with CaptureIQ.

Award details

Awarding agency
Department of Energy
Branch
Not reported
Recipient company
RADIABEAM TECHNOLOGIES, LLC
Proposal award date
2020-06-29
Contract end date
2021-03-28
UEI
Q6NDLV47NBT5
Solicitation number
DE-FOA-0002146
Topic code
30c

Research abstract

The development of a multi-TeV e+e- linear collider is a key priority set by the P5 panel, which established the long-term strategy of the U.S. HEP program. A Two-Beam Acceleration (TBA) is one of the most promising approaches for this facility due to its potential for achieving high efficiency and the ability to accelerate particles with positive and negative charges. However, there are still challenges to develop high-gradient structures above 100 GHz and rf components with sufficient precision to implement structure wakefield acceleration in the short-pulse TBA approach. In response to this problem, RadiaBeam in collaboration with the Argonne Wakefield Accelerator (AWA) Facility proposes will build upon our recent experiences on diagnostics for 110 GHz structures and fabrication studies for a collinear wakefield accelerating structure at 200 GHz. We will develop and build the enabling rf components and instrumentation at ~180 GHz in the context of developing practical TBA SWFA structures: rf couplers with broad bandwidth; efficient waveguide coupling between the decelerator and the accelerator with low rf loss; multipactor-free rf pickup/directional couplers; phase/power shifters; and rf loads. In Phase I we will perform the RF design the 180 GHz structure for the TBA, and the aforementioned RF components. This will be followed by conceptual engineering design, including thermal and mechanical considerations. We will also fabricate and characterize a single cell structure to establish that we can achieve the surface finish and dimensional tolerances required for a GHz structure. The developed accelerating structure will be used in the future electron-positron collider. Other commercial applications include compact Free-Electron Lasers, Terahertz sources and emerging Inverse Compton Sources. Compact high-gradient accelerators are also required for numerous industrial, medical and military applications.

Technology keywords

Not reported

Other awards by this recipient

Verified by the same UEI. These are other public SBIR/STTR award pages, not a merged company record.

Awards with the same topic code

Verified by an exact topic code match. This is not a text-similarity match.

Research funding history

190 SBIR/STTR records share this UEI (2004–2025). Reported award amounts total $96,783,846. Reported amounts are not federal obligations.

Phases: Phase I, Phase II, Phase II – Direct to Phase II

Agencies: Department of Energy, Department of Defense, Department of Homeland Security, National Science Foundation, Department of Health and Human Services, Department of Commerce

Agency intelligence

Department of Energy

Back to SBIR/STTR Research Awards

Don't take our word for it. Ask AI about RFPCapture.

See what leading AI assistants have to say about RFPCapture and CaptureIQ.

Gemini opens without a prefilled question. The question is copied to your clipboard when the button works. You can also copy it here:

What is RFPCapture.com and its CaptureIQ platform from Smart Logic AI? How does it help federal contractors discover opportunities, evaluate bid/no-bid decisions, research government contracts, and prepare proposals? How does it compare with other federal capture platforms? Use independent sources where available.