Novel High Duty Cycle FFAG Betatron for Radiological Source Replacement
Award amount
$149,879Program and phase
SBIR · Phase IAward year
2017Award details
- Awarding agency
- Department of Energy
- Branch
- Not reported
- Recipient company
- RADIABEAM TECHNOLOGIES, LLC
- Proposal award date
- 2017-06-12
- Contract end date
- 2018-03-11
- UEI
- Q6NDLV47NBT5
- Solicitation number
- DE-FOA-0001619
- Topic code
- 23b
Research abstract
Technology keywords
Not reported
Other awards by this recipient
Verified by the same UEI. These are other public SBIR/STTR award pages, not a merged company record.
- Force-Neutral Adjustable Phase Undulator
- L-Band Beam Modulator for X-Band Linear Accelerator
- Engineered Drop-in Systems for Plasma Wakefield Acceleration Experiments
- Lightweight High-Energy X-ray Source for In-Space Nondestructive Evaluation
- DICE: Dual-band Image Combining Equipment
Awards with the same topic code
Verified by an exact topic code match. This is not a text-similarity match.
- Novel Molten Salt Electrode and Insulating Material Development and Testing
- Robust, Standardized High-Temperature Molten Chloride Salt Reference Electrodes
- Early Prediction and Prevention of Frac Screen-out using Deep Reinforcement Learning
- Oxygen Selective Metal Organic Framework Adsorbent for High Efficiency Air Separation
- Oxygen Selective Metal Organic Framework Adsorbents for High Efficiency Air Separation
Research funding history
190 SBIR/STTR records share this UEI (2004–2025). Reported award amounts total $96,783,846. Reported amounts are not federal obligations.
Phases: Phase I, Phase II, Phase II – Direct to Phase II
Agencies: Department of Energy, Department of Defense, Department of Homeland Security, National Science Foundation, Department of Health and Human Services, Department of Commerce