SBIR/STTR Research Award

Rad-Hard Smallsat / CubeSat Avionics Board

Award identifier b10cf64d2a96ae43af2e65da9c38d5951430ac5b24ea2e31ed85553a041c68fdAwarding agency National Aeronautics and Space Administration

Award amount

$124,003

Program and phase

SBIR · Phase I

Award year

2017

Explore This Research Award in CaptureIQ

Research the technology, evaluate the recipient and agency, identify related opportunities, and explore potential follow-on work with CaptureIQ.

Award details

Awarding agency
National Aeronautics and Space Administration
Branch
Not reported
Recipient company
Silicon Space Technology Corporation
Proposal award date
2017-06-09
Contract end date
2017-12-08
UEI
H77JUZDAR365
Solicitation number
Not reported
Topic code
Z8.05

Research abstract

VORAGO will design a rad-hard Smallsat / CubeSat Avionics single board that has the necessary robustness needed for long duration missions in harsh mission environments. The board will exceed processing performance of 100 DMIPS and will include a rad-hard MCU and an FPGA to implement mission specific processing functions. I2C, CAN, SPI, and SpaceWire busses will be supported on-board along with four 8-10bit SERDES interfaces. On-board memory will include 16 MB of EDAC protected RAM, 4 GB of non-volatile memory storage and 256 kB of non-volatile memory for boot software. The board will accept and digitize 16 thermistor inputs and 8 active analog inputs. A watchdog timer and external reset signal will be provided on the board. The board will be no bigger than 90mm x 90mm and will be specified to consume no more than 3W. The deliverables for the project will include board schematics, bill of materials and costing, industry-standard deliverables for fabrication of the board, assembly and testing. In addition, a thorough component analysis will be reported including power consumption characteristics (to demonstrate that 3W will not be exceeded) and radiation performance specifications to ensure that the board has been designed to meet the objective of long duration missions in radiation environments. A board-level FMEA will be supplied as part of the deliverable and QML design practices will be followed and documented. In addition, a detailed list of software and hardware development tools for programming and developing command and data handling software will be supplied. Important software such as an RTOS will be supplied.

Technology keywords

Not reported

Other awards by this recipient

Verified by the same UEI. These are other public SBIR/STTR award pages, not a merged company record.

Awards with the same topic code

Verified by an exact topic code match. This is not a text-similarity match.

Research funding history

33 SBIR/STTR records share this UEI (2005–2020). Reported award amounts total $18,593,887. Reported amounts are not federal obligations.

Phases: Phase I, Phase II

Agencies: Department of Defense, National Aeronautics and Space Administration

Agency intelligence

National Aeronautics and Space Administration

Back to SBIR/STTR Research Awards

Don't take our word for it. Ask AI about RFPCapture.

See what leading AI assistants have to say about RFPCapture and CaptureIQ.

Gemini opens without a prefilled question. The question is copied to your clipboard when the button works. You can also copy it here:

What is RFPCapture.com and its CaptureIQ platform from Smart Logic AI? How does it help federal contractors discover opportunities, evaluate bid/no-bid decisions, research government contracts, and prepare proposals? How does it compare with other federal capture platforms? Use independent sources where available.