SBIR/STTR Research Award

A Fast Neutron Source for Material Irradiation using a Superconducting Electron Linac

Award identifier bdff7d8d321bb30e7332ffd5eba60917af5448ac4d7ea9c707d20153d7c010caAwarding agency Department of Energy

Award amount

$1,000,000

Program and phase

STTR · Phase II

Award year

2017

Explore This Research Award in CaptureIQ

Research the technology, evaluate the recipient and agency, identify related opportunities, and explore potential follow-on work with CaptureIQ.

Award details

Awarding agency
Department of Energy
Branch
Not reported
Recipient company
Niowave, Inc.
Proposal award date
2017-04-10
Contract end date
2019-04-09
UEI
WJLJSN2AT8P1
Solicitation number
DE-FOA-0001645
Topic code
16d

Research abstract

Next generation reactor R&D aims to produce safer, longer lasting and economically viable nuclear power plants. New designs rely on novel materials that are resistant to both corrosive environments and radiation damage. Testing these novel materials requires an intense fast neutron environment, commonly created with a nuclear reactor or a national laboratory scale accelerator such as the proposed Material Test Station at Los Alamos National Lab (using a 800 MeV proton beam). However, the need for a high fast neutron flux to induce significant material damage used to be provided by the Fast Flux Test Facility (FFTF). Unfortunately, FFTF no longer exists; and there are currently no fast-neutron reactors in the United States, and development of MTS is currently on hold. Fast neutron fluxes greater than 1014 n/cm2s is required for in-situ radiation damage studies, whereas, fluxes greater than 1015 n/cm2s is required for radiation damage studies with significant displacements per atom (DPA). We propose a convenient and low-cost alternative: an intense source of fast, fission- like spectrum, neutrons produced from a superconducting electron linac. The proposed source uses photonuclear reactions (γ,n), photo-fission reactions (γ,f), and neutron-induced fission (n,f), producing fast neutron fluxes greater than 1014 n/cm2s. The electron linac specification for the proposed fluxes requires a 40 MeV electron beam with beam powers over 50 kW. This accelerator energy and power level is within the capabilities of superconducting linacs under development at Niowave. In addition to demonstrating fast fluxes in excess of 1014 n/cm2s, we will explore methods and layout plans for exceeding fast fluxes 1015 n/cm2s. Independent of this proposal, Niowave is building a radioisotope production facility using a 40 MeV and >100 kW superconducting electron linac. The proposed fast neutron source will utilize the same linac as the isotope production station. However, a beamline switchyard will direct the beam between the two end-stations: one for isotope production, another is for material irradiations. Because a majority of the development is already underway with the isotope production facility, and because of the progress we made in Phases I and II, our intent is to have the proposed commercial fast neutron source operational by the completion of Phase IIA. In addition to offering beam time at our user facility we intend to build a dedicated material testing system that will be commercially available for research.

Technology keywords

Not reported

Other awards by this recipient

Verified by the same UEI. These are other public SBIR/STTR award pages, not a merged company record.

Awards with the same topic code

Verified by an exact topic code match. This is not a text-similarity match.

Research funding history

58 SBIR/STTR records share this UEI (2007–2020). Reported award amounts total $27,594,609. Reported amounts are not federal obligations.

Phases: Phase I, Phase II

Agencies: Department of Energy, Department of Defense, Department of Homeland Security

Agency intelligence

Department of Energy

Back to SBIR/STTR Research Awards

Don't take our word for it. Ask AI about RFPCapture.

See what leading AI assistants have to say about RFPCapture and CaptureIQ.

Gemini opens without a prefilled question. The question is copied to your clipboard when the button works. You can also copy it here:

What is RFPCapture.com and its CaptureIQ platform from Smart Logic AI? How does it help federal contractors discover opportunities, evaluate bid/no-bid decisions, research government contracts, and prepare proposals? How does it compare with other federal capture platforms? Use independent sources where available.