SBIR/STTR Research Award

A Fast Neutron Source using a Superconducting Electron Linac for Materials Testing

Award identifier 8f3c3df89262e24362e7f87d2c61cb4c31d300fff7d1a75fbdc959a2083f5059Awarding agency Department of Energy

Award amount

$225,000

Program and phase

SBIR · Phase I

Award year

2014

Explore This Research Award in CaptureIQ

Research the technology, evaluate the recipient and agency, identify related opportunities, and explore potential follow-on work with CaptureIQ.

Award details

Awarding agency
Department of Energy
Branch
Not reported
Recipient company
Niowave, Inc.
Proposal award date
2014-02-18
Contract end date
2014-11-17
UEI
WJLJSN2AT8P1
Solicitation number
DE-FOA-0000969
Topic code
16d

Research abstract

Next generation reactor concepts cater to a common goal of providing safer, longer lasting and economically viable nuclear power plants. Developing radiation damage resistant materials for both in- core and out-of core applications is a critical component of these next generation power plants. Testing these novel materials requires an intense neutron environment. A commonly used tool for testing novel materials is a high flux fast neutron environment. Evaporation, fission-like spectrum neutrons are currently generated at either a nuclear reactor or a national laboratory scale accelerator such as the proposed Material Test Station at Los Alamos National Lab (a 800 MeV proton beam). However, there are currently no fast-neutron reactors in the United States, and MTS will not be operational before 2015 (at the earliest). These restrictions require researchers to ship samples overseas (e.g.: France). We propose a convenient and low-cost alternative: an intense source of fast fission-spectrum neutrons produced from a superconducting electron linac. The proposed source is based on the photo production of neutrons, including (,n) production and photofission, with a 40 MeV electron beam with power of up to 100 kW. This accelerator energy and power level is within the capabilities of superconducting linacs now being developed by Niowave. In a parallel development independent to this proposal, Niowave is currently building a radioisotope production facility using a 40 MeV, 100 kW superconducting electron linac. Construction will begin in early 2014, and will be completed by the end of 2015. The proposed fast neutron source will be housed at a separate target station. This SBIR would involve the design, optimization and licensing issues of the fast neutron source. Because a majority of the development is already underway with the isotope production facility, our intent is to have the proposed commercial neutron user facility operational by the completion of Phase II. Phase III of this proposal will make the technology to build an entire neutron source facility available as a commercial product.

Technology keywords

Not reported

Other awards by this recipient

Verified by the same UEI. These are other public SBIR/STTR award pages, not a merged company record.

Awards with the same topic code

Verified by an exact topic code match. This is not a text-similarity match.

Research funding history

58 SBIR/STTR records share this UEI (2007–2020). Reported award amounts total $27,594,609. Reported amounts are not federal obligations.

Phases: Phase I, Phase II

Agencies: Department of Energy, Department of Defense, Department of Homeland Security

Agency intelligence

Department of Energy

Back to SBIR/STTR Research Awards

Don't take our word for it. Ask AI about RFPCapture.

See what leading AI assistants have to say about RFPCapture and CaptureIQ.

Gemini opens without a prefilled question. The question is copied to your clipboard when the button works. You can also copy it here:

What is RFPCapture.com and its CaptureIQ platform from Smart Logic AI? How does it help federal contractors discover opportunities, evaluate bid/no-bid decisions, research government contracts, and prepare proposals? How does it compare with other federal capture platforms? Use independent sources where available.