SBIR/STTR Research Award

Non-linear Inserts for a Rapid Cycling Synchrotron Replacement for the Fermilab Booster Synchrotron

Award identifier a66be6fa268a69ab64d857c6b4d96c055664d1d7a979c90a47c716becec1145bAwarding agency Department of Energy

Award amount

$1,099,290

Program and phase

SBIR · Phase II

Award year

2020

Explore This Research Award in CaptureIQ

Research the technology, evaluate the recipient and agency, identify related opportunities, and explore potential follow-on work with CaptureIQ.

Award details

Awarding agency
Department of Energy
Branch
Not reported
Recipient company
RADIABEAM TECHNOLOGIES, LLC
Proposal award date
2020-08-24
Contract end date
2022-08-23
UEI
Q6NDLV47NBT5
Solicitation number
DE-FOA-0002156
Topic code
26f

Research abstract

Modern accelerator systems are limited in intensity because high intensity beams lose a lot of particles that activate or damage the accelerator itself. The stability of these beams, and thus the intensity limit, comes from the approach of designing accelerators with a linear lattice. The integrable optics technique fixes this problem by making the accelerator manifestly non-linear, but also stable. This technique requires a special non-linear magnet system that is custom to each accelerator that uses it. The integrable optics technique is currently being tested at the Integrable Optics Test Accelerator at Fermilab. After that test, the next step is a facility-sized implementation of integrable optics. One proposed test is the replacement of the Fermilab booster ring with a rapid cycling synchrotron (iRCS) that uses integrable optics. That accelerator will require a larger version of the special non- linear insert we built for IOTA at Fermilab. We are proposing here to build one of the special non- linear magnets for the replacement booster ring. During Phase I, we advanced the magnetic design of the non-linear insertion. We optimized the solution for the non-linear field potential, which allowed the proper harmonic content for a larger aperture required in iRCS and performed tolerance study. Furthermore, we created the mechanical engineering model pursuing the main goal of fabrication cost reduction. In Phase II, we will fabricate, assemble and test the new non-linear insert design for a larger accelerator – iRCS booster – and upgrade our magnetic measurement systems that are needed to measure the magnetic fields of the new 8m-long insertion. The principal users of these magnets are large national laboratories upgrading or building high intensity particle accelerators. Other potential uses include as a driver for accelerator driven subcritical fission reactors that produce shorter half-life daughter products and use fuel that is less weaponizable, e.g. thorium.

Technology keywords

Not reported

Other awards by this recipient

Verified by the same UEI. These are other public SBIR/STTR award pages, not a merged company record.

Awards with the same topic code

Verified by an exact topic code match. This is not a text-similarity match.

Research funding history

190 SBIR/STTR records share this UEI (2004–2025). Reported award amounts total $96,783,846. Reported amounts are not federal obligations.

Phases: Phase I, Phase II, Phase II – Direct to Phase II

Agencies: Department of Energy, Department of Defense, Department of Homeland Security, National Science Foundation, Department of Health and Human Services, Department of Commerce

Agency intelligence

Department of Energy

Back to SBIR/STTR Research Awards

Don't take our word for it. Ask AI about RFPCapture.

See what leading AI assistants have to say about RFPCapture and CaptureIQ.

Gemini opens without a prefilled question. The question is copied to your clipboard when the button works. You can also copy it here:

What is RFPCapture.com and its CaptureIQ platform from Smart Logic AI? How does it help federal contractors discover opportunities, evaluate bid/no-bid decisions, research government contracts, and prepare proposals? How does it compare with other federal capture platforms? Use independent sources where available.