Non-linear Inserts for a Rapid Cycling Synchrotron Replacement for the Fermilab Booster Synchrotron
Award amount
$199,703Program and phase
SBIR · Phase IAward year
2019Award details
- Awarding agency
- Department of Energy
- Branch
- Not reported
- Recipient company
- RADIABEAM TECHNOLOGIES, LLC
- Proposal award date
- 2019-07-01
- Contract end date
- 2020-03-31
- UEI
- Q6NDLV47NBT5
- Solicitation number
- DE-FOA-0001941
- Topic code
- 26f
Research abstract
Technology keywords
Not reported
Other awards by this recipient
Verified by the same UEI. These are other public SBIR/STTR award pages, not a merged company record.
- Force-Neutral Adjustable Phase Undulator
- L-Band Beam Modulator for X-Band Linear Accelerator
- Engineered Drop-in Systems for Plasma Wakefield Acceleration Experiments
- Lightweight High-Energy X-ray Source for In-Space Nondestructive Evaluation
- DICE: Dual-band Image Combining Equipment
Awards with the same topic code
Verified by an exact topic code match. This is not a text-similarity match.
- Long-Term Radiation Rugged Rotary Vacuum and Water Seals in Heavy-Ion Accelerators, Topic 26F
- Non-linear Inserts for a Rapid Cycling Synchrotron Replacement for the Fermilab Booster Synchrotron
- Long-term Radiation Rugged Rotary Vacuum and Water Seals in Heavy-Ion Accelerators
- Long-term Radiation Rugged Rotary Vacuum and Water Seals in Heavy-Ion Accelerators
Research funding history
190 SBIR/STTR records share this UEI (2004–2025). Reported award amounts total $96,783,846. Reported amounts are not federal obligations.
Phases: Phase I, Phase II, Phase II – Direct to Phase II
Agencies: Department of Energy, Department of Defense, Department of Homeland Security, National Science Foundation, Department of Health and Human Services, Department of Commerce