Drivetrain For High Capacity Factor Distributed Wind Turbine
Award amount
$99,784Program and phase
SBIR · Phase IAward year
2019Award details
- Awarding agency
- Department of Agriculture
- Branch
- Not reported
- Recipient company
- PECOS WIND POWER INC
- Proposal award date
- 2019-07-31
- Contract end date
- 2020-04-14
- UEI
- NJ4EG5ED2H95
- Solicitation number
- USDA-NIFA-SBIR-006649
- Topic code
- 8.6
Research abstract
Technology keywords
Not reported
Other awards by this recipient
Verified by the same UEI. These are other public SBIR/STTR award pages, not a merged company record.
- Foundation and Installation System to Reduce the Cost of Distributed Wind Turbines
- Streamlined microgrid solution that integrates wind, solar, and existing diesel generators for DoD energy independence
- TiltUp Tower and Installation System to Reduce the Cost of Distributed Wind Turbines
- Drivetrain for High Capacity Factor Distributed Wind Turbine
- Tilt-Up Tower and Installation System to Reduce the Cost of Distributed Wind Turbines
Awards with the same topic code
Verified by an exact topic code match. This is not a text-similarity match.
- Sargassum-Based Building Material for Affordable Housing Construction and Job Creation in Rural Communities
- Defending Fisheries and Rural Communities: Innovative 3D-Printed Living Seawalls
- Bridging Nutritional Education and Autonomy for Rural Health Transformation
- AMA: An AI-Driven Special Education Support Platform for Education in Rural Communities.
- SBIR Phase I: Evaluating the Feasibility of an On-site Rapid Lead Analyzer to Support Community and Rural Based Healthy Drinking Water Initiatives
Research funding history
7 SBIR/STTR records share this UEI (2019–2024). Reported award amounts total $5,799,056. Reported amounts are not federal obligations.
Phases: Phase II, Phase I, Phase II – Direct to Phase II
Agencies: Department of Energy, Department of Defense, Department of Agriculture