SBIR/STTR Research Award

Reverse Engineering of Obsolete 512K X 32 Bit Static Random Access Memory (SRAM)

Award identifier 5f2541998a7964fbb285fc9c2382ef4a0ebd6a27066ba63a8c89be0e7555635fAwarding agency Department of Defense · Air Force

Award amount

$736,419

Program and phase

SBIR · Phase II

Award year

2020

Explore This Research Award in CaptureIQ

Research the technology, evaluate the recipient and agency, identify related opportunities, and explore potential follow-on work with CaptureIQ.

Award details

Awarding agency
Department of Defense
Branch
Air Force
Recipient company
GLOBAL CIRCUIT INNOVATIONS INC
Proposal award date
2020-05-01
Contract end date
2021-08-31
UEI
E652EP6DMVA7
Solicitation number
DoD SBIR X19.2
Topic code
AF193-CSO1

Research abstract

In this effort, GCI will deliver a form, fit, and function drop-in microcircuit to replace an obsolete 512Kx32 bit Static Random Access Memory (SRAM). This urgent need was brought to our attention by Michael Spencer, F-22 Program Technical Lead at BAE Electronic Systems, and is used in a module within the RF unit in the Electronic Warfare (EW) system of an F-22, which is supported at the Ogden Air Logistics Complex (OO-ALC) at Hill AFB, UT. During the Phase I effort, GCI was able to identify the USAF Technical Point of Contacts (TPOCs) Vince Eddards/NH-04/Chief, F-22 Avionics and Ted Stokes/NH-04/Chief, Sustainment, F-22. GCI has interacted with numerous stakeholders of the project including BAE Systems engineering, contracts, program management, as well as members of the F-22 sustainment team. Our primary contact at BAE Systems is Michelle Moran, Senior Mechanical Engineer. The F-22 has a requirement for up to 500+ units of 512Kx32 bit SRAM. This SRAM is currently obsolete, making it no longer available in inventory or in the supply chain. GCI will perform reverse engineering to provide a form, fit, and function, drop-in replacement that will work identically to the obsolete 512Kx32 SRAM. Not only does this provide the USAF F-22 with a solution, but a Phase II project will generate an 80% cost savings and 75% schedule savings relative to an expensive and time-consuming system redesign. During the Phase I, GCI was able to identify the engineering approach and schedule to move forward for a solution to be executed in a Phase II contract.

Technology keywords

Not reported

Other awards by this recipient

Verified by the same UEI. These are other public SBIR/STTR award pages, not a merged company record.

Awards with the same topic code

Verified by an exact topic code match. This is not a text-similarity match.

Research funding history

27 SBIR/STTR records share this UEI (2016–2024). Reported award amounts total $10,340,209. Reported amounts are not federal obligations.

Phases: Phase I, Phase II

Agencies: Department of Defense

Agency intelligence

Department of Defense

Back to SBIR/STTR Research Awards

Don't take our word for it. Ask AI about RFPCapture.

See what leading AI assistants have to say about RFPCapture and CaptureIQ.

Gemini opens without a prefilled question. The question is copied to your clipboard when the button works. You can also copy it here:

What is RFPCapture.com and its CaptureIQ platform from Smart Logic AI? How does it help federal contractors discover opportunities, evaluate bid/no-bid decisions, research government contracts, and prepare proposals? How does it compare with other federal capture platforms? Use independent sources where available.